Situated at one of the capital’s most prestigious addresses, InterContinental London Park Lane presents modern luxury accommodation in the heart of Mayfair.
Within our refurbishment package we were delighted to perform the radical transformation of the 3rd and 4th floors into the ‘brand-new’ Mayfair Collection, to an exceptional level of detail, craftsmanship and design. This being the beautiful realisation of their most luxurious guestrooms and suites yet. It is a further refinement of the timeless elegance for which the hotel is known and loved and a reflection of all that is rare about the prized location, where two Royal Parks meet. It is profound and effortless comfort, wood, leather, pure wool, and marble that set the soulful, natural tone. Subtle embroidery and cast bronze interpret the pure beauty of tree and leaf. The Mayfair Collection is city life made harmonious.
It has been our pleasure working with the hotel and their excellent team.
● | Full refurbishment of 121 bedrooms and bathrooms to new contemporary “Mayfair” design, including associated corridors |
● | Full demolition and building survey to include room sizing and dimensions |
● | Creation of 21 new Suites and cloak rooms |
● | Creation of 18 new Executive rooms |
● | Refurbishment of 82 standard bedrooms |
● | New electrical lighting & power installations which include a state of the art lighting/dimming scheme |
● | Adaptions to existing sprinkler installation and creation of a new design |
● | Replacement of all the bedroom fan coil units, controls and valve actuation |
● | Replacement bathroom supply and extract ducts |
● | New domestic and waste services to all bathrooms |
● | New wall and ceiling finishes throughout. To include corridors |
● | New bathroom waterproofing encapsulation |
● | Bespoke slab marble to all bathrooms |
● | Full upgrade of fire prevention services |
● | Refurbishment of existing window seals and balcony floor finishes |
● | Manufacture and installation of all fixed joinery, which includes new doors sets to all areas |
“the project was completed to a high standard and within budget. For the duration County worked collaboratively with the project team overcoming issues on the build in a prompt, efficient and professional manner. A good working relationship was established between the onsite team and key property team members working in alignment with the hotel business demands throughout the duration of the project. Being a two-stage project, the Team suggested improvements to the design which assisted the 2nd build and enhanced the overall quality of the product. I would not hesitate to recommend County Contractors."
Executive Assistant Manager – Intercontinental London Park Lane
Client: | Intercontinental Hotel Group |
---|---|
Location: | London |
Budget: | £12M |
Scope: | Remodelling and refurbishment of 2 floors. |
Total 121 new Mayfair rooms | |
Team: | PM: Hook Consultancy |
QS: Tower Eight | |
Designers: RPW, HLM Architects | |
MEP: BSG |
.